The Water Plant is now able to run with automation and no longer requires the manual process. We are still using the temporary raw water line and looking at ways to best build supports for the line.

As a reminder, please be mindful of water consumption until we are able to get the main raw water line back in operation. We do not have an ETA yet, however, the engineers and the operators are developing the best options.